Head Q's

synail

Known Member
Senior Member
Hi guys,

Before sending the head for machining
do I need to clean/remove the sticky oil leftover?

Do I need to take out the valves?
 
I lap the valve after the machining process...rite?

When you say machining I assume you mean skim the base and PNP job? As long as you're careful with the skimmed surface, it doesn't matter which you do first. Personally I did the valve after the skimming. I also did a few other small things like powerlynz which needs to be machined on the valve itself which explains why I didn't lap the valve first. Then there was the Singh groove.

All depends on what it is you wanted to do la.
 
I jez finished cleaning the head...i just need a common head job.....its a 13 y.o. motor...1st time diy
PNP = smoothing the intake port rite...1st stage?

---------- Post added at 11:49 AM ---------- 6 hour anti-bump limit - Previous post was at 11:35 AM ----------

Is this considered clean? The diy is way off schedule..
 

Attachments

  • IMG_20150605_114826.jpg
    IMG_20150605_114826.jpg
    198.9 KB · Views: 125
Last edited:
Hey you guys were rite
Petrol, diesel and kerosene works

And its raining heavily...

Rain = 10
Me = 4

---------- Post added at 03:30 PM ---------- 6 hour anti-bump limit - Previous post was at 03:23 PM ----------

Since doing porting already why nothing the exhaust also?

Actually.... I'm not familiar with pnp
 

Search

Enjoying Zerotohundred?

Log-in for an ad-less experience

Online now

Back
Top